Progress pic's for 12 Fret 000 commissioned by Denny McLaughlin

Click on Picture for larger view.

 

dm_linings 001.jpg (50874 bytes)

dm_linings 002.jpg (52230 bytes) dm_linings 008.jpg (45075 bytes) dm_linings 009.jpg (50613 bytes)

Sanding sides in radius dish

More side profiling. 

Pre-bending linings on

electric bending pipe. 

Hot  hide glued linings clamped on.

dm_linings 010.jpg (47175 bytes)

snow_1.jpg (74359 bytes)

snow_2.jpg (75673 bytes)

 snow_sunrise.jpg (58229 bytes)

Cedar back linings  finished.

Looking out my front door

this morning.

One more.

Sunrise.

snow_stopped.jpg (55748 bytes) back_braces 036.jpg (46422 bytes) back_braces 038.jpg (38833 bytes) back_braces 039.jpg (43526 bytes)
Snow stopped. Back joined with backstrip. Close-up of  backstrip. Ready for re-enforcing strip.
back_braces 041.jpg (35160 bytes) back_braces 040.jpg (53556 bytes) back_braces 043.jpg (46517 bytes) glue_back 017.jpg (37757 bytes)

Dry fitting mahogany

back braces.

Gluing in side re-enforcing

strips.

Side re-enforcing

completed.

Top joined and glued
glue_back 018.jpg (41068 bytes) glue_back 021.jpg (16563 bytes) glue_back 019.jpg (24206 bytes) glue_back 023.jpg (47180 bytes)

Weighted down until

glue dries.

Cutting brace notches.   Notches completed.
glue_back 024.jpg (50811 bytes) glue_back 025.jpg (37934 bytes)

Back glued on

in go-bar deck.

   

Go to previous page  Next Go to next page

Home

Jump to page

1  2  3  4  5  6  7